Precision CNC-Finished A380 & ADC12 Aluminum Die Cast Parts | Custom OEM/ODM Service
Attribute | Value |
---|---|
Materials | Aluminum ADC12, A380 (custom alloys available) |
Casting Method | High-pressure (cold/hot chamber) die casting on 200-1,200 ton presses |
CNC Machining | Milling, turning, drilling and 3-axis/4-axis/5-axis finishing to achieve tight tolerances |
Tolerance | Standard ±0.05 mm; customizable down to ±0.01 mm based on geometry |
Surface Treatments | Powder coating (60-120 μm), electrophoresis (12-25 μm), anodizing, plating, polishing, shot blasting |
Production Capacity | ~100 tons/month die casting; CNC finishing per project scale |
MOQ & Lead Time | Prototype & small batch: 100 kg minimum; tooling 4-12 weeks; samples in ~1 week; production 2-4 weeks |
We specialize in high-pressure die casting of aluminum alloys A380 and ADC12, followed by precision CNC machining and optional surface treatments (powder coating, anodizing, polishing). With die-casting machines from 200 to 1,200 tons and CNC mills/turns for finishing, we deliver parts from prototypes through mass production under strict quality control.
Parameter | Specification |
---|---|
Materials | Aluminum ADC12, A380 (custom alloys available) |
Casting Method | High-pressure (cold/hot chamber) die casting on 200-1,200 ton presses |
CNC Machining | Milling, turning, drilling and 3-axis/4-axis/5-axis finishing to achieve tight tolerances |
Tolerance | Standard ±0.05 mm; customizable down to ±0.01 mm based on geometry |
Surface Treatments | Powder coating (60-120 μm), electrophoresis (12-25 μm), anodizing, plating, polishing, shot blasting |
Part Size & Weight | From 3 g up to 20 kg per piece; dimensions per customer drawing |
Production Capacity | ~100 tons/month die casting; CNC finishing per project scale |
MOQ & Lead Time | Prototype & small batch: 100 kg minimum; tooling 4-12 weeks; samples in ~1 week; production 2-4 weeks |
Quality Control | ISO 9001-certified processes; in-process inspection; CMM, hardness, and coating thickness testing; 100% final QC inspection |
Packaging & Shipping | Pallet/wooden crate packing with anti-static foam; air or sea freight |
A1: Prototype and sample runs start at 100 kg total casting weight (approx. 5-30 pcs depending on part size).
A2: We support 2D: PDF, DWG/DXF; 3D: STEP, IGES, SolidWorks, CATIA for accurate tooling and machining setup.
A3: In-process probing, statistical process control (SPC), and final CMM inspection ensure tolerances within ±0.01-0.05 mm.
A4: Yes--rush tooling and sample services can reduce prototype turnaround to 3-5 days; full production in 1-2 weeks.
A5: Standard export packaging with anti-static foam, cartons, and wooden crates; custom packaging upon request to protect delicate assemblies.